Project to reach up to 15,500kW of Electrical Energy together with the WEG company in China.

Project Scope:
All motors are 11kV high voltage motors, of which 3 are horizontal induction motors, model MGW Ex ec, 15,500 kW and body 1000, and 8 are vertical induction motors, model MGR, with power between 900 and 3,000 kW.
The 11 high voltage motors supplied in this project with a total capacity of 60,660 kW use centrifugal compressors from Ingersoll Rand, circulators from Leo Group, long shaft pumps and condensate pumps from Ebara Pump, respectively.
voltage regulator up to 15,500kW

Board characteristics
The electrical panels are the most important equipment in the plant. In addition to controlling various types of electrical components such as motors, pumps, valves, fans, etc., they also provide protection to entire plant circuits. With the meters we can see the variables of this component or grid. They usually perform one of the following functions: control, measurement, manipulation and protection.
These devices come in different shapes and sizes depending on the specific function they are meant to perform, whether for home or industry.
Acquisition of mining machines

Our commitment to investors is our top priority, which is why the acquisition of mining equipment is carried out through a very detailed process with our suppliers located in China, creating a solid structure.
The first thing is to choose a good supplier of mining equipment that meets the delivery and punctuality requirements. We achieve this through an intermediary that is located directly in the country of origin “China”, the company ensures that the requested products are the indicated ones. that are actually sent.
Local check of machines

Although we have a middleman to help verify materials and ensure product delivery, we test the machines on site to ensure product authenticity and 100% functionality.
In turn, they will be set to start working on the farm and investors can start receiving rewards.
Proper zero emission installation

As we mentioned before, the mining farm is completely ecological and we try to ensure zero CO2 emissions, which is why we work in special rooms for this purpose.
supervision and maintenance

Finally, we oversee all the infrastructure set up to meet our mining objectives, and we work and study every day how to improve each of our operations, including the purchase of more powerful and durable machines.